Transform your boring tables into captivating visual stories

Unlock the future of data storytelling. Grunt's Visual Grid transforms complex numbers into stunning, dynamic visuals that bring your insights to life, directly within PowerPoint.

Smart table Large animated

Elevate your data storytelling

icon-thumb-up

Make your data pop with intuitive design

Transform raw data into visually stunning and impactful tables effortlessly. Grunt’s Visual Grid provides intuitive design options that make your insights instantly clear and engaging.

icon-checklist

Ensure perfect accuracy and real-time updates

Say goodbye to manual errors and outdated information. Our industry-leading Excel Connection keeps your tables perfectly synced, ensuring data accuracy and traceability for every number.

icon-graphic-circle

Automate tedious formatting for flawless results

Reclaim valuable time spent on manual adjustments. Grunt's Visual Grid automates formatting, guaranteeing pixel-perfect alignment and on-brand consistency, every time.

Harness the power of connection

excel-connection-small

Stay synced with Excel

Connect your tables directly to Excel spreadsheets for real-time updates. Eliminate copy-pasting and manual screenshots, ensuring your data is always current and accurate.

smart-table-large

Make data pop with visual styles

Choose from a wide array of built-in visual styles to tell the right story with your data. Transform numbers into compelling narratives that resonate and drive action.

Everything in one intelligent object

Say goodbye to stacked shapes and patchwork formatting. Visual Grid tables are clean, contained and fully interactive, simplifying editing and ensuring a unified appearance.

image25-35

Apply seamless styling rules

Add powerful built-in conditional formatting rules directly within the table. Automatically highlight key changes, trends or critical values, guiding your audience to what matters most.

Advanced customization for perfect visuals

Cloud upload@4x

Auto-format as data changes 

Layouts and visuals intelligently adapt to new data.

icon-thumb-up

Enforce best practice styling

Apply brand and data rules automatically.

Line chart@4x

Customizable grid layouts

Tailor table structures to your specific needs.

Checklist@4x

Row and column management

Easily insert, delete or hide rows and columns.

Bar chart@4x

Advanced data visualization

Explore new ways to represent complex data.

Video@4x

Interactive table elements

Engage your audience with dynamic components.

Folders@4x

Flexible data source links

Connect to various data points with ease.

Computer phone@4x

Integrated company logos

Drop in the right logo instantly, perfectly placed.

A tool for the whole team

Streamline financial reporting with visual clarity

Transform complex financial data into clear, compelling tables that update instantly from Excel, ensuring accuracy and saving hours on reporting cycles.

_DSC7083 1

Elevate client data presentations

Deliver sharper insights and more engaging visuals in client reports. Grunt's Visual Grid makes complex data digestible and impactful, enhancing your professional credibility.

Man sitting next to standing woman

Visualize insights with precision and speed

Focus on analysis, not design. Grunt's Visual Grid empowers you to quickly create accurate, stunning data tables that effectively communicate your findings.

Man up close

Create impactful visual narratives

Rapidly transform market data into visually compelling tables for campaigns and reports, ensuring consistent brand identity and clear messaging.

Man and woman walking in office

Ensure data integrity and governance

Implement a centralized solution for secure, consistent data visualization across the organization, reducing manual errors and compliance risks.

Man working on laptop
woman-scarf

From manual formatting to meaningful storytelling

Explore how Grunt helped Sprint Consulting strengthen its ability to communicate insights with speed, accuracy and impact which enhances both their internal efficiency and the experience they deliver to clients.

 

2x

Boost in efficiency

With Grunt, Sprint freed up time for the team to focus on what matters most: building the story, crafting arguments, and adding value for the client.

 

A consistent premium look

"Grunt gives us complete confidence that our data and presentations are always in sync. The assurance of accuracy combined with a consistently premium look has raised the standard of everything we deliver."

 

Read more

FAQ

Visual Grid reinvents tables for faster, clearer data storytelling. Combine objects, link live data, and let Grunt automate the formatting—so your slides look perfect every time.

It aligns, spaces and formats everything automatically, so you don’t waste time nudging objects around pixel by pixel.

Yes. Visual Grid is built for complex data. It handles financial tables like P&L with ease—keeping numbers aligned, formats consistent, and layouts crystal clear.

With Visual Grid you can go beyond plain tables: Add heatmaps, variance highlights, progress bars, company logos, flags, and icons that make your data easier to read and faster to explain.

Yes. Visual Grids created with Grunt can be shared and viewed by any PowerPoint user.

Other product areas

man-looking-to-camera

Why choose Grunt?

Our purpose is to revolutionize business communication, dissolving the distance between raw data and crucial decisions.

Grunt doesn't just save time. We fundamentally shift how brilliant minds utilize their expertise, moving from manually "aligning boxes" to crafting insights that transform businesses.

Rather than pursuing aesthetic completeness, Grunt focuses on crafting targeted, clear storytelling that directly drives business outcomes and improves decision quality.

Related resources

mg_consulting_quote-1

Grunt and the future of AI in PowerPoint

Explore how Grunt and Microsoft's Copilot are revolutionizing PowerPoint with AI.

laptop-hands-graphic

Guide: Choosing the right type of chart for your data 

With so many chart types out there, how do you know which one is right for your data?

_DSC6789 1

A consultant's tip to meet tight deadlines

Explore the strategies needed to excel in high-pressure scenarios as a business consultant.

two-people-with-laptops

The true cost of wasting time in PowerPoint

We explore the true cost of when valuable time is overspent on low-value tasks.

Miljøbilder_sprint26235 (1)

Create a highly impactful PowerPoint presentation

Explore 12 of our best tips and tricks from ex-consultants to create stunning presentations.

video-default-image-3

Guide: PowerPoint presentations for consultants 

We take you through all the stages from chart disaster to professional business charting.

Ready to let Grunt do the grunt work?

Reduce hours of manual charting and slide updates down to seconds. Schedule a brief, focused walkthrough to see how Grunt handles slide making while maintaining absolute data accuracy across every presentation.

CTA banner image (5)